We believe Azerbaijan’s socio-economic development is closely linked with entrepreneurship and its future development!
Winners of the Startup Competition Held Within the Framework of the Islamic Development Bank Group Annual Meetings Announced HELF and AZHAB Forums Held in Baku During the 51st Annual Meetings of the Islamic Development Bank Group Startup Competition Launched Within the Framework of the IsDB Annual Meetings HELF/AZHAB Forum 2026 to Be Held Within the Framework of the IsDB Group Annual Meetings in Baku A meeting with entrepreneurs was held in the Khizi district For the attention of micro and small entrepreneurs wishing to present their products and services at the “Local Companies Promotion Exhibition!” ANNOUNCEMENT An online meeting of the Management Board of the CICA Business Council was held What is the support amount paid for conducting an internal market study and on what basis is this amount determined? The appeals of entrepreneurs from the Gazakh–Tovuz economic region were heard
Azerbaijani startup offers a new type of wind energy turbines 20.07.23
Azerbaijani startup offers a new type of wind energy turbines

In March of this year, funding the winning projects of the 3rd grant competition announced by the Small and Medium Business Development Agency (KOBİA) for funding projects of micro, small and medium entities in the fields of education, science, research and support has been commenced.


"Kuleko - creation of a new type of wind energy turbines", a project of "Kuleko" LLC, was one of the 13 winning projects.


"Kuleko" LLC reported that the new wind turbine differs from conventional wind generators in that it has a horizontal axis and has special fixed panels (these panels are also patented). Classic vertical-axis wind generators consist of "fan-like" devices that must rotate, or "find the wind", depending on the direction of the wind. Such generators therefore require an additional rotating mechanism to find the wind.


The new device is completely different and sits horizontally - parallel to the ground. As a result, it rotates across all wind directions and takes up less space. As a result, multiple such devices can be installed in a single location.


The dimensions of the generator depend on its place. Currently, work is underway on a 2.5x2.5 meter minimal working model.


"Kuleko" comes in two models – on with battery (off-grid) and without battery (on-grid). The advantage of the battery option is that the energy harnessed during the operation of the device while in operation is stored in the battery and the stored energy can be used even in the absence of wind.


https://marja.az/105686/azerbaycan-startapi-yeni-tipli-kulek-enerjisi-turbinleri-teklif-edir 

 

 

Powered by Froala Editor